Home Services Projects About Blog Contact 07967 232435 WhatsApp us Get a Free Quote
A house part way through renovation, stripped back under a new glazed roof
Renovations

Buying a House to Renovate? What to Check Before You Make an Offer

By David Abbott, Director · · 6 min read

Surveys, roofs, damp, wiring, drains, asbestos, knotweed and planning history: the checks to make before you offer on a house that needs work, from a builder's point of view.

Before you make an offer on a house to renovate, get the right survey (usually a RICS Level 3 for an older or run-down home) and look hard at the expensive, hidden things: the roof, the structure, damp, electrics, heating and drains. Check for asbestos, Japanese knotweed, listed status and any past work done without building regulations sign-off, and make sure your lender will actually lend on the house in its current state.

The cosmetic jobs are rarely what catches buyers out. It is the hidden problems that swallow the money meant for the new kitchen and bathroom. If you can, bring a builder to a second viewing before you exchange, so you know what you are taking on and can negotiate with your eyes open.

Choose the right survey

A mortgage valuation is not a survey. It tells the lender the house is worth the loan, not what is wrong with it. For a property that needs work you want a proper survey from a RICS surveyor:

  • RICS Home Survey Level 2 (formerly the HomeBuyer Report) suits conventional houses in reasonable condition.
  • RICS Home Survey Level 3 (formerly the Building Survey) is more detailed and is the better choice for older, larger, altered or run-down properties, which covers most renovation projects.

If the surveyor recommends further investigation, such as a structural engineer, an electrician or a drain survey, get it done before you exchange. Once contracts are exchanged, the problems are yours.

Roof, structure and damp

The roof is one of the biggest single items on any renovation. Look for a dipping ridge, slipped or missing tiles, patched valleys, leaning or cracked chimney stacks and stained ceilings upstairs. If you can get into the loft, check for daylight, damp timbers and torn or missing felt. If the roof is near the end of its life, factor in roofing work before anything else.

For the structure, most hairline cracks are harmless, but take note of:

  • Cracks you can fit a coin into, or that are wider at one end
  • Diagonal cracks running from the corners of windows and doors
  • Stepped cracks following the mortar joints
  • Doors and windows that stick or are visibly out of square
  • Bulging walls, sloping floors, and chimney breasts removed downstairs with nothing obvious holding up the rest

Much of Essex sits on clay that shrinks and swells with the seasons, so large trees close to the house are worth noting too.

Damp is the other big one, and it is also the most often misdiagnosed. Be wary of a report from a company that sells the treatment. Our guide to rising damp, penetrating damp and condensation explains how to tell them apart and what each usually needs.

Electrics, heating, plumbing and drains

Signs that a house needs rewiring include an old fuse box with rewireable fuses, round pin sockets, sockets mounted on the skirting, rubber or fabric covered cables and no RCD protection. Ask whether there is a recent Electrical Installation Condition Report (EICR), or have one done. A full rewire is messy, so it needs to happen early, before any plastering or decorating.

For heating, find out the age of the boiler, whether it has a service history and gas safety record, and what condition the radiators and pipework are in. Older homes can still have a lead water supply pipe, which should be replaced.

Drains are out of sight and easily forgotten. A CCTV drain survey can show root ingress, cracked or collapsed clay pipes, and pitch fibre pipes from the 1950s to 1970s that can deform with age. It also shows whether drains are shared with neighbours, which matters if you plan to extend over them.

Asbestos and Japanese knotweed

Asbestos was used widely in British homes until it was banned in 1999, so any house built or refurbished before 2000 could contain it. Common places include textured ceiling coatings, old floor tiles, soffits, garage roofs, boiler flues, cold water tanks and pipe lagging. In good condition and left alone it is often low risk, but it must not be drilled, sanded or broken. Before a significant renovation, an asbestos refurbishment survey tells you what is there and what needs safe removal by a specialist.

Japanese knotweed can affect your mortgage and your plans for the garden. Sellers are asked about it on the property information form, but look for yourself, including along boundaries. In summer it has bamboo-like stems and shovel-shaped leaves; in winter it dies back to brown, hollow canes. If it is present, lenders usually want to see a professional treatment plan.

Listed status, conservation areas and planning history

Check whether the house is listed using the National Heritage List for England. Listed building consent is needed for works that affect its character, inside as well as out, and that will shape what you can do and how. Historic towns such as Saffron Walden and Maldon have a lot of older and listed properties, so it is worth checking early. Conservation areas are set by councils and can restrict things like windows, roofs and extensions; check the council's planning pages.

Look up the planning history on the council's planning portal too. If the house has an extension, a loft conversion, a garage conversion or walls knocked through, ask for the planning permission (where needed) and the building regulations completion certificate. If they are missing, your solicitor may suggest indemnity insurance or a regularisation application to the council. Be aware that indemnity policies generally will not pay out if the council has already been contacted about the work, so take advice before you call anyone.

Mortgages and uninhabitable properties

Many mainstream lenders will not lend on a house they consider uninhabitable, typically one without a working kitchen or bathroom, or with serious structural or roof problems. Some will lend but hold back part of the money until specified work is done. Buyers in that position often use cash, bridging finance or a specialist renovation mortgage. Speak to a mortgage broker before you offer, not after the valuation comes back.

Your insurer may also have conditions for a property that is empty or under major works, so check that early too.

Get a builder to view, and plan the order of work

A surveyor tells you what is wrong. A builder can tell you what it will take to put it right and in what order. If you can, ask a builder to walk round with you before you exchange, so you go into negotiations knowing the scale of the job. We work right across Essex, from Clacton-on-Sea to Saffron Walden, and our quotes are free and itemised. Costs always depend on the property and the specification, which is why a quote based on the actual house beats any guesswork.

Once you own it, the order of work matters as much as the work itself:

  1. Make it weathertight: roof, chimneys, gutters, and any failed windows.
  2. Structure and damp sources: structural repairs, drains and anything letting water in.
  3. Layout changes: knock throughs, new openings and any extension.
  4. First fix services: rewiring, plumbing and heating pipework while walls and floors are open.
  5. Plastering: once the services are in and the walls are dry.
  6. Second fix and finishes: kitchen, bathroom, joinery, flooring and decorating.

Running it in that order means nothing gets done twice. With one in-house team covering building, plumbing, electrics and finishing, our general renovations service handles that sequence for you from start to finish.

A house that needs work can be a great buy, as long as the price reflects what it really needs. Do the checks, get the right people to look at it, and make your offer based on facts rather than hope.

Frequently asked questions

For most renovation projects, probably not. A Level 2 survey is designed for conventional houses in reasonable condition and does not go into much detail on defects. A Level 3 survey is more thorough, explains the likely causes of problems and suggests what to do about them, which is what you need when a house is older, altered or run down. If you are unsure, ask the surveyor which level suits the specific property before you book.

It can be difficult. Many mainstream lenders treat a house without a working kitchen or bathroom as uninhabitable and will not lend on it, or will hold back part of the loan until the work is done. Some buyers use cash, bridging finance or a specialist renovation mortgage instead. A mortgage broker who knows this market can tell you what is available before you make an offer, which saves wasted fees on a purchase that cannot proceed.

On an older house, or any house with large trees nearby, a CCTV drain survey is a sensible check. It can reveal root ingress, cracked or collapsed clay pipes and deformed pitch fibre pipes, none of which you can see from the garden. It also shows the route of the drains and whether any are shared, which matters if you plan to build an extension over or near them. Repairs found after you buy are yours to pay for.

Your solicitor will usually raise it during conveyancing. The common routes are an indemnity insurance policy, which covers the legal risk of enforcement but does nothing about the quality of the work, or a regularisation application to the council, which may involve opening up parts of the work for inspection. Do not contact the council yourself before taking advice, because that can stop an indemnity policy from paying out. Get a builder to look at the work too.

Thinking about a project like this?

Ask for a call back and Abbotts Build Hub will talk it through with you, or send us a message on WhatsApp with a few photos.

Related services

Keep reading

Related articles